APIA FLOODWAY AND DRAINAGE PROJECT
CLIENT:

Government of Samoa 

LOCATION:

Apia, Samoa

FUNDED BY:

Asian Development Bank

PROJECT PERIOD:

November 2005 – June 2010

PROJECT DESCRIPTION:

The Project’s three components are (i) drainage, (ii) wastewater management and sanitation, and (iii) capacity building.

Project outputs include (i) improved floodways; (ii) rehabilitated existing drains; (iii) installation of water gauges for flood monitoring; (iv) design, construction, and operation of a wastewater collection and treatment system; (v) utility-managed individual sanitation systems; and (vi) strengthened institutions and legislative frameworks for wastewater management, drainage, urban management, and environmental monitoring.

PROJECT SERVICES:

Overall Project management:

Develop comprehensive project implementation and monitoring plans.

Prepare a project performance monitoring system (STET).

Establish document control and contract management systems.

Review and assess project designs, drawings, and the bidding documents.

Develop bidding procedures based on Asian Development Bank (ADB) Guidelines on Procurement.

Develop reporting procedures and reporting to ADB.

Provide training and on-the-job guidance on project management.

 

Deliver project community awareness program in coordination with overall community awareness capacity building.

SHARE : 

  • Facebook
  • Twitter
  • Instagram
174203817_507367590295776_4239598426658330773_n
174203817_507367590295776_4239598426658330773_n

Describe your image

press to zoom
171642600_929686774427574_653981165395232668_n
171642600_929686774427574_653981165395232668_n

Describe your image

press to zoom
179254698_574473266815481_5714764420384688582_n
179254698_574473266815481_5714764420384688582_n

Describe your image

press to zoom
174203817_507367590295776_4239598426658330773_n
174203817_507367590295776_4239598426658330773_n

Describe your image

press to zoom
1/3