APIA FLOODWAY AND DRAINAGE PROJECT
CLIENT:

Government of Samoa

LOCATION:

Apia, Samoa

FUNDED BY:

Asian Development Bank

PROJECT PERIOD:

November 2005 – June 2010

PROJECT DESCRIPTION:

The Project’s three components are (i) drainage, (ii) wastewater management and sanitation, and (iii) capacity building.

Project outputs include (i) improved floodways; (ii) rehabilitated existing drains; (iii) installation of water gauges for flood monitoring; (iv) design, construction, and operation of a wastewater collection and treatment system; (v) utility-managed individual sanitation systems; and (vi) strengthened institutions and legislative frameworks for wastewater management, drainage, urban management, and environmental monitoring.

PROJECT SERVICES:

Overall Project management:

Develop comprehensive project implementation and monitoring plans.

Prepare a project performance monitoring system (STET).

Establish document control and contract management systems.

Review and assess project designs, drawings, and the bidding documents.

Develop bidding procedures based on Asian Development Bank (ADB) Guidelines on Procurement.

Develop reporting procedures and reporting to ADB.

Provide training and on-the-job guidance on project management.

 

Deliver project community awareness program in coordination with overall community awareness capacity building.

SHARE : 

  • Facebook
  • Twitter
  • Instagram
  • Tumblr
DJI_0030
DJI_0030

Describe your image

press to zoom
186528853_1162832730868012_2291026618054232163_n
186528853_1162832730868012_2291026618054232163_n

Describe your image

press to zoom
151314619_1114472595644680_8634544970641988580_n
151314619_1114472595644680_8634544970641988580_n

Describe your image

press to zoom
DJI_0030
DJI_0030

Describe your image

press to zoom
1/3