top of page
GAGAA’EMAUGA NO.1 DISTRICT WATER SUPPLY UPGRADE
CLIENT:

Government of Samoa (through Ministry of Natural Resources and Environment) / World Bank

LOCATION:

Gagaa’emauga No.1 District, Savaii (Patamea, Samalaeulu and Mauga)

FUNDED BY:

Government of Samoa through Ministry of Natural Resources and Environment/ World Bank

PROJECT PERIOD:

6 Months

PROJECT SERVICES:

The aim of this project is to assist the Government of the Independent State of Samoa through the Ministry of Natural Resources and Environment fully assess the water needs of the populations within the district and ability of existing systems to sustainably and reliably meet the needs. Confirm sustainable capacities of the existing water supply sources determine and plan how water catchment areas are to be well managed and investigate all potentials alternate sources. Prepare a detailed long term water supply upgrade options study with cost estimates breakdown and recommendations of the preferred upgrade options.

PROJECT SERVICES:

Overall Project Management

Preliminary and Detail design

Design Team including Environmentalist

Social Impact Specialist

Quantity Surveyor

Geologist

SHARE : 

  • Facebook
  • Twitter
  • Instagram
bottom of page