top of page

NEW ZEALAND HIGH COMMISSION WATER SUPPLY PROJECT
CLIENT:
The New Zealand Government
LOCATION:
New Zealand High Commission Compound, Vaoala
FUNDED BY:
–
ASSOCIATED FIRM(S):
Isikuki Punivalu Associates (IPA)
PROJECT PERIOD:
March 2019 – May 2019
PROJECT DESCRIPTION:
The New Zealand Government contracted IPA with the upgrades of the water supply in the NZHC compound. KEW Consult was contracted by IPA with the designing of the water supply to each resident within the compound.
PROJECT SERVICES:
Designing the correct hydraulics for the project
Pressure Testing
Provide Cut Line Drawings for IPA
Providing an Engineer’s Estimates & Bill of Quantity (BOQ)
Conduct Level Survey and Calculate Elevation
Drone Operations to capture footages and aerial images of the whole compound so we can impose it on our CAD programme for drawings
SHARE :

Describe your image

Describe your image

Describe your image

Describe your image
1/3
bottom of page