top of page

Borehole Development for Commercial Spring Water

Services as part of the programme for design and MSQA of Borehole Development, as agreed by Samoa Pure Water from time to time by issue of a statement of work.

Client:

Samoa Pure Water

​

Location:

Siusega, Samoa

​

Funded by:

Samoa Pure Water

​

Project Period:

29th May 2019 – 10th June 2019

​

Project Description:

Services as part of the programme for design and MSQA of Borehole Development, as agreed by Samoa Pure Water from time to time by issue of a statement of work. Task may include preliminary survey, producing conceptual, preliminary design with engineer’s cost estimate, survey, detailed design and specification Environment and Planning processes and MSQA.

​

Project Services

  • Overall Project Management

  • Preliminary and Detailed design

  • Design Team including Environmentalist

  • Social Impact Specialist

  • Quantity Surveyor

  • Geologist

© 2021 KEW Consult Ltd. All Rights Reserved.

Developed by QTEC Services

bottom of page